Alerts: June 13, 2025: Construction work on the SRHD College Avenue building begins on Monday, June 16, and is expected to continue for eight weeks. Please be mindful of areas around the building that closed for safety. | Some federal websites are experiencing disruptions while being reviewed for compliance with President Trump’s executive orders. As a result, some links and information on srhd.org may be unavailable.
Water Recreation Facility (WRF) Builder Requests Final Pre-Occupancy Inspection
When construction is complete, the builder or other owner representative must request a pre-occupancy inspection from the health district. Requests should be made one week in advance (five working days) to allow for scheduling.
IMPORTANT NOTE: It is the Water Recreation Facility representative’s responsibility to request inspections. The building department DOES NOT automatically forward requests for pre-occupancy inspections to the health district.
Prior to the pre-occupancy inspection, per WAC 246-260-021(6) a construction report from the engineer or architect certifying that the facility was constructed according to the plans must be submitted. A copy of the form can be found here.
Call 509.324.1560, ext.4 (or the individual pool inspector if known) to request a pre-occupancy inspection.